Upcoming Projects
October 2009
Beth H. Acworth, GA ~ Eagle Pointe Church Chapter
- Projects Specs:
- Work began on 10/24/09 but was not finished, 2nd day to be scheduled in Feb. 2010.
- Work to be done:
- Outside
- Seal Windows
- Siding Repair
- Inside
- Check Ceiling in Bedroom
- Insulation
- Washing Machine Doesn't Drain
- Replace Ceiling Fan
- Painting
- Financial Needs to Complete This Project: $300 currently $0 has been raised.
- For Additional Information Contact:
- Project Manager (PM): Brad Vawter
- Assistant PM: Rowland Suttle
- Volunteer Mangaer: Rusty Draper
November 2009
Rachel T. Acworth, GA ~ Eagle Pointe Church Chapter
- Projects Specs:
- Work to begin and finish on 11/14/09.
- Work to be done:
- Remove old playset
- Landscaping
- Finanacial Needs to Complete This Project: $200 currently $0 has been raised.
- For Additional Information Contact:
- Project Manager (PM): John Young
- Assistant PM:
Upcoming Events
October 2009
Acworth, GA ~ Eagle Pointe Church Chapter
Booth at Taste of Acworth.
On Saturday October 17th from 10am to 6pm.
Located in Downtown Acworth
- Temporary Tattoo Booth for Kids
- "Crazy Hair" Station - Color and Shapes
For Additional Information Contact:
Past Projects
September 2009
Gary E. Acworth, GA ~ Eagle Pointe Church Chapter
- Projects Specs:
- Work began on 9/19/09 and finished on 9/26/09.
- Projects Completed:
- Painting Interior
- Floor Repair
- Project Leaders:
- Project Manager (PM): Scott Lohr
- Assistant PM: Tim Roman
July 2009
Shelly R. Marietta, GA ~ Eagle Pointe Church Chapter
- Projects Specs:
- Work began and was finished on 7/11/09.
- Projects Completed:
- Landscaping
- Soffit Repair
- Interior & Exterior Replace Rotting Wood
- Plumbing
- Painting Interior
- Minor Cabinetry Work
- Mold Removal from Ceiling & Wall
- Project Leaders:
- Project Manager (PM): Steve Daniele
- Assistant PM: Brad Vawter
- Volunteer Manager: Rusty Draper
- Special Notes:
- Lunch has been donated by Chic-fil-A
April 2008
Acworth, GA ~ Eagle Pointe Church Chapter
3 Days work in and around home, additional 3 Days of electrical work.
- Projects Completed:
- Tore out 2 sets of steps
- Built new front landing with steps
- Built new steps at rear door
- Painted exterior of home
- Tore out sub-floor of bathroom (had hole in floor to crawl space)
- Replaced existing joists and added support to bathroom
- New bathroom floor, linoleum, toilet, cabinet and sink installed
- Undergrowth around house cut down, trash cleaned up
- Perimeter chain link fence installed
- Two motion sensor floodlights installed for yard
- Entire electrical system replaced (existing system was ungrounded and a fire hazard)
Special Recognition: Turner Vaughn Electric (provided permit for electrical work, materials and oversight)
January 2008
Acworth, GA ~ Eagle Pointe Church Chapter
3 Days of work in and around the home.
- Projects Completed:
- Replaced sections of fascia around house due to rot
- Rebuilt roof over rear screened room to replace rotted roof
- Repaired plumbing in bathroom (bathtub drain, new cabinet and sink)
- Painted exterior of home
- New gutters installed on front and rear of home
- Landscaping
- Painted rear deck railing
Past Events
June 2009
Acworth, GA ~ Eagle Pointe Church Chapter
- Thanks to all who participated in our very successful fundraiser. You helped us raise over $4300.
- Spagetti Dinner
- Magician/Comedian Dinner Show
- Silent Aution
- $1500 Cash Raffle
- $1000 winner - Gary Davila
- $400 winner - Lee Tyndall
- $100 winner - ?